System Type(s):
Manual/Automatic:
Automatic
Mainline Type:
PVC
Mainline Size:
2"
Lateral Lines Type:
PVC
Number of Zones:
36 Zones
Key Needed:
Long Key
Shut Off :
out within Landscape
Connection:
Connect to Quick Coupler in valve boxes SW of Alpine Bank
Clock Make:
Clock Location:
South side if store by fire hydrant
Clock Photo(s):
Is there a Zone Diagram:
Yes
Zone Diagram Arial Image:
Configuration Photo(s):
Size:
2"
Location:
South East of store in open lot.
Turn On Notes:
2 minute test works best and drive through the zones. It takes to much time to walk it.
Make sure to check the 1 battery zone in lawn by power station & Delta Bank.
Winterizing Notes:
Hook up to Quick Coupler with a key in the valve boxes SW by Alpine Bank
Don't forget the Batterey operated zone.
# of Drip Zones:
4Drip Zones
Shut-off Location Photo(s):
Shut Off Location Description:
On the North West corner of the Backflow concrete slab
Shut off Valve Type:
Curb Stop and Drain